Create a Work Breakdown Structure (WBS)
- Break the project down into manageable tasks
Estimate Task Durations
- Get project team or expert to help
- Be wary of over-ambitious estimates
- Be sure to add padding (15-20%)
- Include training time, if required
Convert the WBS to a Network Diagram
- Determine task relationships
- Create a model based ont ask relationships
- Perform CPM/PERT to determine critical path, float, and project duration
Add Resources to the Schedule
- Determine resources, skill sets
- Create a Resource Breakdown Structure (RBS)
- Level/smooth resources, if required
Estimate Overall Project Duration and Cost
- Determine project end date based on critical path